PJM Generation Dispatcher Sample Exam | Questions with 100% Correct Answers | Verified | Latest Update 2024
Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) - D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error - A. system constraints PJM calls for which of the following to recover the ACE so that tie line schedules are maintained ? A. IRC ( instantaneous reserve check ) B. synchronized Reserves C. supplemential reserves D. minimun generation calculation - B. synchronized Reserves
Written for
- Institution
- PJM Generation Dispatcher
- Course
- PJM Generation Dispatcher
Document information
- Uploaded on
- December 13, 2023
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm generation dispatcher sample exam questions
Document also available in package deal