TM-De5 Final Exam Study Questions Correctly Answered.
TM-De5 Final Exam Study Questions Correctly Answered. QUESTION I In the test strategy document your organization declares: - To adopt a V-model development lifecycle, with three formal levels of testinG. unit, integration and system testing - To use a blended risk-based and regression-averse testing strategy for each level of testing The following is an excerpt of the "approach" section for the system test plan document of a new project: "Testing will only use manual tests. Due to the short period of time for test execution, the following activities will be performed in parallel with test execution: Test planning, test analysis and test design. Basic metrics will be taken for test effort (i.e. person-hours), test cases executed (passed/failed), and incidents (no more metrics, such as code coverage, will be collected)." In the system test plan, no deviations from the test strategy are described. Based only on the given information, which of the following statements is tr - CORRECT ANSWER D QUESTION 2 In the next two months some new features will be constantly added to new releases of a project you are working on as Test Manager. You have identified as one ofthe main project risks, that the requirements specification will still be incomplete when your team starts the test design and implementation phase. Some requirements will most likely be completed too late to allow a proper test preparation. You and your test team have already worked on several similar past projects in the same organization. Which one of the following options would you expect to be the most effective at mitigating this risk? K4 3 credits A. Don't prepare any test and just run the regression test suite to check that the new features don't introduce regression B. Make reasonable assumptions about the missing details and design lightweight tests that can be easily updated during test execution C. Don't design any test until the test ex - CORRECT ANSWER B QUESTION 3 Consider the following test strategies: I. Consultative test strategy Il. Reactive test strategy Ill. Analytical test strategy IV. Process-compliant test strategy Consider also the following examples of test activities: I. Prioritize the test cases, based on the results of a FMEA analysis, to ensure early coverage of the most important areas and discovery of the most important defects during test execution 2. Execute usability testing driven by the guidance ofa sample of users (external to the test team) 3. Perform exploratory testing sessions throughout the system test phase 4. On an Agile project, execute tests that cover the test conditions identified for each user story of a feature planned for an iteration Which of the following correctly matches each test strategy with an appropriate example? K2 1 credit B. 1-2; 11-3; 111-4; IV-I C. 1-3; 11-2; 111-1; IV-4 D. 1-1; 11-2; 111-3; IV-4 E. 1-2; 11-3; 111 - CORRECT ANSWER E
Written for
- Institution
- TMS
- Course
- TMS
Document information
- Uploaded on
- June 16, 2024
- Number of pages
- 27
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
tms
-
tm de5 final exam study questions correctly answer
Document also available in package deal