CMP 101 Final Exam Questions and Answers All Correct What are the components of the construction contract? - Primary Specifications - Secondary Specifications - None of these - General Specifications - Plans and Specifications - Answer-Plans and Specifications Which of the following construction plans will show light fixtures and their switches? - Mechanical - Electrical - None of these - Civil - Architectural - Answer-Electrical A Construction Manager would perform the following functions as a part of 'Monitoring Project Performance' - Ensure that all portable toilets are functioning for workers to use. - Ensure the architect has completed all construction drawings - Ensure the project cost is within owner's budget - Ensure that work orders are given to sub-contractors - Ensure the project is proceeding as per the schedule - Answer-- Ensure the project cost is within owner's budget - Ensure the project is proceeding as per the schedule Details regarding concrete beams that support the loads on the building will be shown on the __________________plans - Architectural - Plumbing - Civil - Structural - Electrical - Answer-Structural Once the owner occupies the home, they can call the contractor to come in and fix any issues as long as the home is under the ________________stage - Commissioning - Final Inspection - Design - Warranty - None of these - Answer-Warranty

Show more Read less
Institution
CMP 101
Course
CMP 101










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CMP 101
Course
CMP 101

Document information

Uploaded on
September 1, 2024
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CMP 101 Final Exam Questions
and Answers All Correct
What are the components of the construction contract?
- Primary Specifications
- Secondary Specifications
- None of these
- General Specifications
- Plans and Specifications - Answer-Plans and Specifications

Which of the following construction plans will show light fixtures and their switches?
- Mechanical
- Electrical
- None of these
- Civil
- Architectural - Answer-Electrical

A Construction Manager would perform the following functions as a part of 'Monitoring
Project Performance'
- Ensure that all portable toilets are functioning for workers to use.
- Ensure the architect has completed all construction drawings
- Ensure the project cost is within owner's budget
- Ensure that work orders are given to sub-contractors
- Ensure the project is proceeding as per the schedule - Answer-- Ensure the project
cost is within owner's budget
- Ensure the project is proceeding as per the schedule

Details regarding concrete beams that support the loads on the building will be shown
on the __________________plans
- Architectural
- Plumbing
- Civil
- Structural
- Electrical - Answer-Structural

Once the owner occupies the home, they can call the contractor to come in and fix any
issues as long as the home is under the ________________stage
- Commissioning
- Final Inspection
- Design
- Warranty

,- None of these - Answer-Warranty

In order to start pouring concrete for concrete footings, following steps must be
complete:
(SELECT ALL THAT APPLY)
- Installation of CMU foundation wall
- Installation of Floor Joists
- Footing Formwork Installation
- Footing Rebar Installation
- Installation of Underground Utilities
- Excavation - Answer-- Footing Formwork Installation
- Footing Rebar Installation
- Installation of Underground Utilities
- Excavation

Electrical plans are labelled in the title box as _________________for the first electrical
plan:
- A1
- M1
- E1
- P1
- S1 - Answer-E1

In this type of contract, the owner and architect provide the constructor the estimated
quantities of defined items of work.
- Value-Added Contract
- Unit-Price Contract
- Cost-Plus Fee
- Lump-Sum Contract
- None of these - Answer-Unit-Price Contract

The amount that a buyer pays to purchase a house is known as _____________
- Value
- Cost
- None of these
- Price - Answer-Price

Design and Construction Phases can overlap in the following project delivery method
- Integrated Project Delivery
- CM Agency
- At-Risk CM
- All of these
- Design - Build - Answer-All of these

Each site build project is a ________________________.
- duplicate of the last one using the same plans and specs.

, - civil endeavor
- Prototype
- A and B are correct
- A and C are correct - Answer-Prototype


As a construction manager for a road construction project, you would perform the
following tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - Answer-- Hire skilled workers to perform the
construction work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time

For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - Answer-Building and Non-building
construction

GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - Answer-General Contractor

On a NON-RESIDENTIAL construction project, the Owner may directly hire the
following entities:
(SELECT ALL THAT APPLY)
- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - Answer-- Architect
- Construction Manager

On a residential construction project from the following construction activities, what
activity would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - Answer-Excavation for foundation
R222,30
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Scholarsstudyguide nursing
Follow You need to be logged in order to follow users or courses
Sold
782
Member since
3 year
Number of followers
475
Documents
15262
Last sold
3 days ago
NURSING

Here you will find everything you need in nursing Assignments, EXAMS AND TESTBANKS. For students who want to see results twice as fast. I strive for my content to be of the highest quality. Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.

3,9

164 reviews

5
87
4
21
3
26
2
6
1
24

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions