and Answers All Correct
What are the components of the construction contract?
- Primary Specifications
- Secondary Specifications
- None of these
- General Specifications
- Plans and Specifications - Answer-Plans and Specifications
Which of the following construction plans will show light fixtures and their switches?
- Mechanical
- Electrical
- None of these
- Civil
- Architectural - Answer-Electrical
A Construction Manager would perform the following functions as a part of 'Monitoring
Project Performance'
- Ensure that all portable toilets are functioning for workers to use.
- Ensure the architect has completed all construction drawings
- Ensure the project cost is within owner's budget
- Ensure that work orders are given to sub-contractors
- Ensure the project is proceeding as per the schedule - Answer-- Ensure the project
cost is within owner's budget
- Ensure the project is proceeding as per the schedule
Details regarding concrete beams that support the loads on the building will be shown
on the __________________plans
- Architectural
- Plumbing
- Civil
- Structural
- Electrical - Answer-Structural
Once the owner occupies the home, they can call the contractor to come in and fix any
issues as long as the home is under the ________________stage
- Commissioning
- Final Inspection
- Design
- Warranty
,- None of these - Answer-Warranty
In order to start pouring concrete for concrete footings, following steps must be
complete:
(SELECT ALL THAT APPLY)
- Installation of CMU foundation wall
- Installation of Floor Joists
- Footing Formwork Installation
- Footing Rebar Installation
- Installation of Underground Utilities
- Excavation - Answer-- Footing Formwork Installation
- Footing Rebar Installation
- Installation of Underground Utilities
- Excavation
Electrical plans are labelled in the title box as _________________for the first electrical
plan:
- A1
- M1
- E1
- P1
- S1 - Answer-E1
In this type of contract, the owner and architect provide the constructor the estimated
quantities of defined items of work.
- Value-Added Contract
- Unit-Price Contract
- Cost-Plus Fee
- Lump-Sum Contract
- None of these - Answer-Unit-Price Contract
The amount that a buyer pays to purchase a house is known as _____________
- Value
- Cost
- None of these
- Price - Answer-Price
Design and Construction Phases can overlap in the following project delivery method
- Integrated Project Delivery
- CM Agency
- At-Risk CM
- All of these
- Design - Build - Answer-All of these
Each site build project is a ________________________.
- duplicate of the last one using the same plans and specs.
, - civil endeavor
- Prototype
- A and B are correct
- A and C are correct - Answer-Prototype
As a construction manager for a road construction project, you would perform the
following tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - Answer-- Hire skilled workers to perform the
construction work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time
For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - Answer-Building and Non-building
construction
GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - Answer-General Contractor
On a NON-RESIDENTIAL construction project, the Owner may directly hire the
following entities:
(SELECT ALL THAT APPLY)
- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - Answer-- Architect
- Construction Manager
On a residential construction project from the following construction activities, what
activity would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - Answer-Excavation for foundation