Kano - Samenvattingen, Aantekeningen en Examens

Op zoek naar een samenvatting over Kano? Op deze pagina vind je 165 samenvattingen over Kano.

Pagina 4 van de 165 resultaten

Sorteer op

OCR CHEMISTRY A LEVEL WITH COMPLETE SOLUTIONS     Haloalkane to nitrile - ANSWER-nucleophilic substitution    ethanolic NaCN or KCN    heat    Haloalkane to primary amine (also makes NH4X) - ANSWER-Nucleophilic substitution    Excess ethanolic NH3 with no
  • OCR CHEMISTRY A LEVEL WITH COMPLETE SOLUTIONS   Haloalkane to nitrile - ANSWER-nucleophilic substitution ethanolic NaCN or KCN heat Haloalkane to primary amine (also makes NH4X) - ANSWER-Nucleophilic substitution Excess ethanolic NH3 with no

  • Tentamen (uitwerkingen) • 9 pagina's • 2024
  • OCR CHEMISTRY A LEVEL WITH COMPLETE SOLUTIONS   Haloalkane to nitrile - ANSWER-nucleophilic substitution ethanolic NaCN or KCN heat Haloalkane to primary amine (also makes NH4X) - ANSWER-Nucleophilic substitution Excess ethanolic NH3 with no further substitution HEAT under PRESSURE acyl chloride/acid anhydride to SECONDARY amide - ANSWER-Nucleophilic substitution primary amine Acyl chloride/acid anhydride to PRIMARY amide - ANSWER-Nu...
    (0)
  • €20,07
  • + meer info
Lean Six Sigma Greenbelt Final Exam Review All Possible Questions and Answers with complete solution
  • Lean Six Sigma Greenbelt Final Exam Review All Possible Questions and Answers with complete solution

  • Tentamen (uitwerkingen) • 8 pagina's • 2024
  • Six sigma is more than a quality or cost improvement methodology. It focuses on business ______. - Answer-Process Improvement Six Sigma is not in conflict with other _______ methodologies. - Answer-Improvement Sigma is a greek letter than represents a measure of _____. - Answer-Variability _____ is used on new products or process. - Answer-DFSS The letter __ represents the output of a process. - Answer-Y The ___ of a process is influenced by the inputs. - Answer-outputs Six Sigma provides...
    (0)
  • €7,86
  • + meer info
Six Sigma Black Belt Study Guide questions and answers all are graded A+
  • Six Sigma Black Belt Study Guide questions and answers all are graded A+

  • Tentamen (uitwerkingen) • 16 pagina's • 2024
  • What's Contained on the Charter? - Problem Description, Scope, Project Goals, Customer Benefits, Ownership/Team, Stakeholder Approval, Schedule What are the Three Pillars of PE? - Lean, DMAIIC, DMADV What is used to set Specification Limits? - Customer requirements What is the difference between an Activity Flowchart and a Deployment Flowchart? - Activity Flowchart: displays complexity & decision points in a process done by 1 person. Deployment Flowchart: highlights handoff areas in proce...
    (0)
  • €7,86
  • + meer info
amatrol-ss.2- project management and customer determination exam 2024 latest update(fully solved&updated)dowload to pass
  • amatrol-ss.2- project management and customer determination exam 2024 latest update(fully solved&updated)dowload to pass

  • Tentamen (uitwerkingen) • 7 pagina's • 2024
  • 4 groups of cost of poor quality (COPQ) preventive cost; appraisal cost; internal failure cost; external failure cost COPQ in production process 1. materials and supplies 2. labor 3. time 4. logistics 5. returns and warranty claims 6. employee morale 10 steps of Define phase of SS's DMAIC 1. develop financial plan 2. form project team 3. develop project charter 4. collect customer data and requirements 5. define core processes of project and develop process chart 6. d...
    (0)
  • €14,75
  • + meer info
Lean Six Sigma Green Belt Quiz - Define study guide questions and answers 2024
  • Lean Six Sigma Green Belt Quiz - Define study guide questions and answers 2024

  • Tentamen (uitwerkingen) • 2 pagina's • 2024
  • Measurement may be necessary in the Define Phase to see if a problem exists or not True Measurement never takes place in the Define Phase False Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:00 / 0:00 Full screen Measurement always takes place in the Define Phase False Measurement is done only in the Measure Phase False Projects should be selected by the project team False Improvement projects shoul...
    (0)
  • €16,72
  • + meer info
Six Sigma Black Belt Session 3 Questions and Answers Graded A+
  • Six Sigma Black Belt Session 3 Questions and Answers Graded A+

  • Tentamen (uitwerkingen) • 6 pagina's • 2024
  • Six Sigma Black Belt Session 3 Questions and Answers Graded A+ Which of the following is a Supporting Service Requirement (vs. Primary Output Requirement)? A) Order-entry is efficient and customer-friendly. B) Delivery is provided quickly and with no issues. C) Product or service provided performs as specified. D) Quality concerns from customers are handled in a professional manner. A) Order-entry is efficient and customer-friendly. Which of the following statements accurately reflec...
    (0)
  • €9,83
  • + meer info
Six Sigma Black Belt Session 3 Correctly  Answered Questions| UpToDate | Already  Graded A+
  • Six Sigma Black Belt Session 3 Correctly Answered Questions| UpToDate | Already Graded A+

  • Tentamen (uitwerkingen) • 5 pagina's • 2024
  • Which of the following is a Supporting Service Requirement (vs. Primary Output Requirement)? A) Order-entry is efficient and customer-friendly. B) Delivery is provided quickly and with no issues. C) Product or service provided performs as specified. D) Quality concerns from customers are handled in a professional manner. : A) Order-entry is efficient and customer-friendly. Which of the following statements accurately reflects the Kano Model? A) Over time, Basic Quality characteristics t...
    (0)
  • €10,13
  • + meer info
judo yellow belt Correct 100%(GRADED A+)
  • judo yellow belt Correct 100%(GRADED A+)

  • Tentamen (uitwerkingen) • 3 pagina's • 2024
  • hiza guruma - ANSWERknee wheel throw o goshi - ANSWERmajor hip throw kesa gatame - ANSWERscarf hold shizen hentai - ANSWERbasic natural posture ippon seio nage - ANSWERshoulder throw morote seio nage - ANSWERshoulder throw (lapel hand low) yoko shio gamtame - ANSWERside hold who was the founder of judo - ANSWERjigoro kano what was the name of the school he founded? - ANSWERthe kodokan what is the date of the founding of judo? - ANSWER1882 what was unarmed combat cal...
    (0)
  • €14,75
  • + meer info
IEE 381 Final Study Guide With Complete Questions With Detailed Answers.
  • IEE 381 Final Study Guide With Complete Questions With Detailed Answers.

  • Tentamen (uitwerkingen) • 6 pagina's • 2024
  • DMAIC - correct answer Define, Measure, Analyze, Improve, Control sort, set in order, shine, standardize, sustain - correct answer 5s Design for Six Sigma - correct answer Matches Customer Needs with Manufacturing Capability Shewhart Cycle - correct answer Plan, Do, Check, Act Pareto Chart - correct...
    (0)
  • €12,79
  • + meer info
Six Sigma- Yellow Belt Questions and Answers
  • Six Sigma- Yellow Belt Questions and Answers

  • Tentamen (uitwerkingen) • 6 pagina's • 2024
  • Problem Statement- Include - Answer-o Process/Defect o Timeframe o Baseline metrics o Cost/Benefit Goal Statement - Answer-o Targeted Improvement o Timeframe o Projected Financial Benefits Project Defect - Answer-Instance which fails to meet customer requirement Metrics - Answer--Primary Metric - Big "Y" o Secondary Metrics Possible negative consequences Financial Benefit - Answer-o Hard Savings Directly Impact the bottom line Cost Reduction Revenue Enhancement o Soft Savings I...
    (0)
  • €7,86
  • + meer info