Kano - Samenvattingen, Aantekeningen en Examens
Op zoek naar een samenvatting over Kano? Op deze pagina vind je 165 samenvattingen over Kano.
Pagina 4 van de 165 resultaten
Sorteer op
-
OCR CHEMISTRY A LEVEL WITH COMPLETE SOLUTIONS Haloalkane to nitrile - ANSWER-nucleophilic substitution ethanolic NaCN or KCN heat Haloalkane to primary amine (also makes NH4X) - ANSWER-Nucleophilic substitution Excess ethanolic NH3 with no
- Tentamen (uitwerkingen) • 9 pagina's • 2024
-
- €20,07
- + meer info
OCR CHEMISTRY A LEVEL WITH COMPLETE SOLUTIONS 
 
 
 
Haloalkane to nitrile - ANSWER-nucleophilic substitution 
 
 
 
ethanolic NaCN or KCN 
 
 
 
heat 
 
 
 
Haloalkane to primary amine (also makes NH4X) - ANSWER-Nucleophilic substitution 
 
 
 
Excess ethanolic NH3 with no further substitution 
 
 
 
HEAT under PRESSURE 
 
 
 
acyl chloride/acid anhydride to SECONDARY amide - ANSWER-Nucleophilic substitution 
 
 
 
primary amine 
 
 
 
Acyl chloride/acid anhydride to PRIMARY amide - ANSWER-Nu...
-
Lean Six Sigma Greenbelt Final Exam Review All Possible Questions and Answers with complete solution
- Tentamen (uitwerkingen) • 8 pagina's • 2024
-
- €7,86
- + meer info
Six sigma is more than a quality or cost improvement methodology. It focuses on business ______. - 
Answer-Process Improvement 
Six Sigma is not in conflict with other _______ methodologies. - Answer-Improvement 
Sigma is a greek letter than represents a measure of _____. - Answer-Variability 
_____ is used on new products or process. - Answer-DFSS 
The letter __ represents the output of a process. - Answer-Y 
The ___ of a process is influenced by the inputs. - Answer-outputs 
Six Sigma provides...
-
Six Sigma Black Belt Study Guide questions and answers all are graded A+
- Tentamen (uitwerkingen) • 16 pagina's • 2024
-
- €7,86
- + meer info
What's Contained on the Charter? - Problem Description, Scope, Project Goals, Customer 
Benefits, Ownership/Team, Stakeholder Approval, Schedule 
What are the Three Pillars of PE? - Lean, DMAIIC, DMADV 
What is used to set Specification Limits? - Customer requirements 
What is the difference between an Activity Flowchart and a Deployment Flowchart? - Activity 
Flowchart: displays complexity & decision points in a process done by 1 person. 
Deployment Flowchart: highlights handoff areas in proce...
-
amatrol-ss.2- project management and customer determination exam 2024 latest update(fully solved&updated)dowload to pass
- Tentamen (uitwerkingen) • 7 pagina's • 2024
-
- €14,75
- + meer info
4 groups of cost of poor quality (COPQ) 
preventive cost; appraisal cost; internal failure cost; external failure cost 
 
 
 
COPQ in production process 
1. materials and supplies 
2. labor 
3. time 
4. logistics 
5. returns and warranty claims 
6. employee morale 
 
 
 
10 steps of Define phase of SS's DMAIC 
1. develop financial plan 
2. form project team 
3. develop project charter 
4. collect customer data and requirements 
5. define core processes of project and develop process chart 
6. d...
-
Lean Six Sigma Green Belt Quiz - Define study guide questions and answers 2024
- Tentamen (uitwerkingen) • 2 pagina's • 2024
-
- €16,72
- + meer info
Measurement may be necessary in the Define Phase to see if a problem exists or not 
True 
 
 
 
Measurement never takes place in the Define Phase 
False 
 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:00 
/ 
0:00 
Full screen 
Measurement always takes place in the Define Phase 
False 
 
 
 
Measurement is done only in the Measure Phase 
False 
 
 
 
Projects should be selected by the project team 
False 
 
 
 
Improvement projects shoul...
Teveel maand over aan het eind van je geld?
-
Six Sigma Black Belt Session 3 Questions and Answers Graded A+
- Tentamen (uitwerkingen) • 6 pagina's • 2024
-
Ook in voordeelbundel
-
- €9,83
- + meer info
Six Sigma Black Belt Session 3 
Questions and Answers Graded A+ 
 
Which of the following is a Supporting Service Requirement (vs. Primary Output Requirement)? 
A) Order-entry is efficient and customer-friendly. 
B) Delivery is provided quickly and with no issues. 
C) Product or service provided performs as specified. 
D) Quality concerns from customers are handled in a professional manner. A) Order-entry is 
efficient and customer-friendly. 
 
Which of the following statements accurately reflec...
-
Six Sigma Black Belt Session 3 Correctly Answered Questions| UpToDate | Already Graded A+
- Tentamen (uitwerkingen) • 5 pagina's • 2024
-
Ook in voordeelbundel
-
- €10,13
- + meer info
Which of the following is a Supporting Service Requirement (vs. Primary Output 
Requirement)? 
A) Order-entry is efficient and customer-friendly. 
B) Delivery is provided quickly and with no issues. 
C) Product or service provided performs as specified. 
D) Quality concerns from customers are handled in a professional manner. 
: A) Order-entry is efficient and customer-friendly. 
Which of the following statements accurately reflects the Kano Model? 
A) Over time, Basic Quality characteristics t...
-
judo yellow belt Correct 100%(GRADED A+)
- Tentamen (uitwerkingen) • 3 pagina's • 2024
-
Ook in voordeelbundel
-
- €14,75
- + meer info
hiza guruma - ANSWERknee wheel throw 
 
o goshi - ANSWERmajor hip throw 
 
kesa gatame - ANSWERscarf hold 
 
shizen hentai - ANSWERbasic natural posture 
 
ippon seio nage - ANSWERshoulder throw 
 
morote seio nage - ANSWERshoulder throw (lapel hand low) 
 
yoko shio gamtame - ANSWERside hold 
 
who was the founder of judo - ANSWERjigoro kano 
 
what was the name of the school he founded? - ANSWERthe kodokan 
 
what is the date of the founding of judo? - ANSWER1882 
 
what was unarmed combat cal...
-
IEE 381 Final Study Guide With Complete Questions With Detailed Answers.
- Tentamen (uitwerkingen) • 6 pagina's • 2024
-
Ook in voordeelbundel
-
- €12,79
- + meer info
DMAIC - correct answer Define, Measure, Analyze, Improve, Control 
 
sort, set in order, shine, standardize, sustain - correct answer 5s 
 
Design for Six Sigma - correct answer Matches Customer Needs with Manufacturing Capability 
 
Shewhart Cycle - correct answer Plan, Do, Check, Act 
 
Pareto Chart - correct...
-
Six Sigma- Yellow Belt Questions and Answers
- Tentamen (uitwerkingen) • 6 pagina's • 2024
-
Ook in voordeelbundel
-
- €7,86
- + meer info
Problem Statement- Include - Answer-o Process/Defect 
o Timeframe 
o Baseline metrics 
o Cost/Benefit 
Goal Statement - Answer-o Targeted Improvement 
o Timeframe 
o Projected Financial Benefits 
Project Defect - Answer-Instance which fails to meet customer requirement 
Metrics - Answer--Primary Metric - Big "Y" 
o Secondary Metrics 
Possible negative consequences 
Financial Benefit - Answer-o Hard Savings 
Directly Impact the bottom line 
Cost Reduction 
Revenue Enhancement 
o Soft Savings 
I...
€5,99 voor je samenvatting, vermenigvuldigt met 100 medestudenten... Reken maar uit: dat is veel geld! Wees geen dief van je eigen portemonnee en start nu met uploaden. Ontdek alles over verdienen op Stuvia