M81 - Samenvattingen, Aantekeningen en Examens

Op zoek naar een samenvatting over M81? Op deze pagina vind je 30 samenvattingen over M81.

Alle 30 resultaten

Sorteer op

EBOLC QUESTIONS AND ANSWERS EXAMS 2024 Populair
  • EBOLC QUESTIONS AND ANSWERS EXAMS 2024

  • Tentamen (uitwerkingen) • 8 pagina's • 2024 Populair
  • Never attach M456 Det Cord, an M151, or an M152 to this component. - CORRECT ANSWER- M81 An _________ can accommodate and ensure proper proximity for initiating up to 5 shock tubes, 5 M151/152's OR 1 strand of M456 Det Cord. - CORRECT ANSWER- M9 Holder This component has a high-strength blasting cap, factory-crimped to a 30-ft length of shock tube. It also has a small J-hook for easy attachment to M456 Let Cord, a yellow flag 2 meters from the blasting cap and a red flag 1 meter from the ...
    (0)
  • €10,79
  • 1x verkocht
  • + meer info
Voorbeeld Position paper Module 8 Populair
  • Voorbeeld Position paper Module 8

  • Tentamen (uitwerkingen) • 19 pagina's • 2024
  • Hierbij verkoop ik mijn eindposition paper, geschreven als afsluiting van de opleiding HBO-V in module 8. Dit position paper kan ook andere studierichtingen inspireren of als voorbeeld dienen, omdat de criteria vrijwel identiek zijn voor alle studierichtingen op de CHE, met slechts kleine variaties in details. Hopelijk helpt dit verslag je bij het afstuderen. Succes en alvast gefeliciteerd! *Namen en plaatsen zijn geanonimiseerd.
    (0)
  • €13,49
  • 4x verkocht
  • + meer info
EBOLC Demolition Questions with correct answers
  • EBOLC Demolition Questions with correct answers

  • Tentamen (uitwerkingen) • 13 pagina's • 2023
  • Never attach M456 Det Cord, an M151, or an M152 to this component. CORRECT ANSWER M81 An _________ can accommodate and ensure proper proximity for initiating up to 5 shock tubes, 5 M151/152's OR 1 strand of M456 Det Cord. CORRECT ANSWER M9 Holder This component has a high-strength blasting cap, factory-crimped to a 30-ft length of shock tube. It also has a small J-hook for easy attachment to M456 Let Cord, a yellow flag 2 meters from the blasting cap and a red flag 1 meter from the blasti...
    (0)
  • €14,23
  • + meer info
EBOLC Demolition Study Guide
  • EBOLC Demolition Study Guide

  • Tentamen (uitwerkingen) • 5 pagina's • 2023
  • M11 (Cap Type/ Length) CORRECT ANSWER High Strength/ 30 ft M12 (Cap Type/Length) CORRECT ANSWER Low Strength/ 500ft M13 (Cap Type/Length) CORRECT ANSWER Low Strength/ 1000ft M14 (Cap Type/Length) CORRECT ANSWER High Strength/7.5ft M18 (Cap Type/Length) CORRECT ANSWER High Strength/ 30ft M19 (Cap Type/Length) CORRECT ANSWER High Strength/ 200ft M21 (Cap Type/Length) CORRECT ANSWER High Strength/ 500ft M23 (Cap Type/Length) CORRECT ANSWER High Strength/ 1000ft M151 (Cap Typ...
    (0)
  • €15,21
  • + meer info
EBOLC Safety Quiz Question and answers rated A+
  • EBOLC Safety Quiz Question and answers rated A+

  • Tentamen (uitwerkingen) • 3 pagina's • 2024
  • EBOLC Safety Quiz Question and answers rated A+ EBOLC Safety Quiz What knots can be used to prime C4 when using Detonation Cord? - correct answer Double overhand Uli knot Can you connect a M11 using the J-Hook to a M151? - correct answer NO MDI components can't be connected to J hook, only det cord How much of the blasting cap is clearly visible at both ends when taping? - correct answer 1/8"-1/4" What knot is used when tying Det Cord into a ring or line main? - cor...
    (0)
  • €13,25
  • + meer info
EBOLC Safety questions with correct answers
  • EBOLC Safety questions with correct answers

  • Tentamen (uitwerkingen) • 3 pagina's • 2023
  • What knots can be used to prime C4 when using Detonation Cord? CORRECT ANSWER Double overhand Uli knot Can you connect a M11 using the J-Hook to a M151? CORRECT ANSWER NO MDI components can't be connected to J hook, only det cord How much of the blasting cap is clearly visible at both ends when taping? CORRECT ANSWER 1/8"-1/4" What knot is used when tying Det Cord into a ring or line main? CORRECT ANSWER -Girth hitch w/ extra turn -Square knot What can not be initiated directly...
    (0)
  • €16,20
  • + meer info
EBOLC Demolition 2023 Updated  Exam
  • EBOLC Demolition 2023 Updated Exam

  • Tentamen (uitwerkingen) • 5 pagina's • 2023
  • EBOLC Demolition 2023 Updated Exam M11 (Cap Type/ Length) - ANSWER- High Strength/ 30 ft M12 (Cap Type/Length) - ANSWER- Low Strength/ 500ft M13 (Cap Type/Length) - ANSWER- Low Strength/ 1000ft M14 (Cap Type/Length) - ANSWER- High Strength/7.5ft M18 (Cap Type/Length) - ANSWER- High Strength/ 30ft M19 (Cap Type/Length) - ANSWER- High Strength/ 200ft M21 (Cap Type/Length) - ANSWER- High Strength/ 500ft M23 (Cap Type/Length) - ANSWER- High Strength/ 1000ft M151 (Cap Type/Length) - ANSWER...
    (0)
  • €11,78
  • + meer info
EBOLC Demolition 2023 Updated  Exam
  • EBOLC Demolition 2023 Updated Exam

  • Tentamen (uitwerkingen) • 5 pagina's • 2023
  • EBOLC Demolition 2023 Updated Exam M11 (Cap Type/ Length) - ANSWER- High Strength/ 30 ft M12 (Cap Type/Length) - ANSWER- Low Strength/ 500ft M13 (Cap Type/Length) - ANSWER- Low Strength/ 1000ft M14 (Cap Type/Length) - ANSWER- High Strength/7.5ft M18 (Cap Type/Length) - ANSWER- High Strength/ 30ft M19 (Cap Type/Length) - ANSWER- High Strength/ 200ft M21 (Cap Type/Length) - ANSWER- High Strength/ 500ft M23 (Cap Type/Length) - ANSWER- High Strength/ 1000ft M151 (Cap Type/Length) - ANSWER...
    (0)
  • €11,28
  • + meer info
EBOLC Demolition 2023 Updated  Exam
  • EBOLC Demolition 2023 Updated Exam

  • Tentamen (uitwerkingen) • 5 pagina's • 2024
  • EBOLC Demolition 2023 Updated Exam M11 (Cap Type/ Length) - ANSWER- High Strength/ 30 ft M12 (Cap Type/Length) - ANSWER- Low Strength/ 500ft M13 (Cap Type/Length) - ANSWER- Low Strength/ 1000ft M14 (Cap Type/Length) - ANSWER- High Strength/7.5ft M18 (Cap Type/Length) - ANSWER- High Strength/ 30ft M19 (Cap Type/Length) - ANSWER- High Strength/ 200ft M21 (Cap Type/Length) - ANSWER- High Strength/ 500ft M23 (Cap Type/Length) - ANSWER- High Strength/ 1000ft M151 (Cap Type/Length) - ANSWER...
    (0)
  • €9,81
  • + meer info
EBOLC Demolition Questions With  Answers
  • EBOLC Demolition Questions With Answers

  • Tentamen (uitwerkingen) • 8 pagina's • 2023
  • EBOLC Demolition Questions With Answers Never attach M456 Det Cord, an M151, or an M152 to this component. - CORRECT ANSWER- M81 An _________ can accommodate and ensure proper proximity for initiating up to 5 shock tubes, 5 M151/152's OR 1 strand of M456 Det Cord. - CORRECT ANSWER- M9 Holder This component has a high-strength blasting cap, factory-crimped to a 30-ft length of shock tube. It also has a small J-hook for easy attachment to M456 Let Cord, a yellow flag 2 meters from ...
    (0)
  • €12,76
  • + meer info