100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LIRR solution pack 2024 R922,47   Add to cart

Package deal

LIRR solution pack 2024

1 Exam (elaborations) LIRR 2yr BOR verified already passed 2 Exam (elaborations) LIRR AC Conductor Signals & Definitions question n answers graded A+ 2024/2025 3 Exam (elaborations) LIRR Air Brake Questions well answered graded A+

36 items

Palsgraf v. Long Island Rail Road (1928) verified to pass 2024/2025

(0)
R177,26

Palsgraf v. Long Island Rail Road (1928)What were the facts of the case and what happened to Mrs. Palsgraf? - correct answer A passenger was running on the platform with a package, hoping he could still catch his train which was already leaving. Two guards believed the man was about to fall off the ...

View example

Palsgraf v. Long Island R.C questions with 100% correct answers 2024

(0)
R177,26

Palsgraf v. Long Island R.CTopic Area - correct answer Negligence; Duty of Care Summary - correct answer Even the most cautious person would not have expected the package wrapped in newspaper to explode. Explosion was the proximate cause of the plaintiff's injuries. Legal Issue - correct a...

View example

Lirr questions with verified solutions 2024

(0)
R177,26

pilot - correct answer An Employee assigned to a train or track car when the engineer conductor or track car driver is not qualified on the physical characteristics or rules of the railroad or portion of the railroad over which the movement is to be made Interlocking - correct answer An arrangeme...

View example

LIRR questions well answered rated A+

(0)
R319,20

LIRRWhat is the first importance in the discharge of duty? - correct answer Safety What must be done when in doubt or uncertainty? - correct answer In case of doubt or uncertainty a SAFE course must be taken What is essential to safety? - correct answer Obedience is essential to safety W...

View example

LIRR correctly answered passed

(0)
R274,84

LIRRBLOCK LIMIT STATION - correct answer A PLACE AT WHICH A BLOCK LIMIT SIGNAL IS DISPLAYED BLOCK STATION - correct answer A PLACE AT WHICH MANUAL BLOCK SIGNALS ARE DISPLAYED BLOCK SIGNAL - correct answer A fixed signal or hand signal in the absence of a fixed signal, at the entrance to a bloc...

View example

LIRR YARDS questions & answers 2024

(0)
R177,26

LIRR YARDSWEST SIDE YARD - correct answer FURTHEST MOST WEST YARD WEST OF PENN STATION, DEAD ENDS WESTSIDE HWY AND 33RD ST BELMONT YARD - correct answer SOUTH OF THE MAINLINES IN BELMONT PARK, SOUTH OF QUEENS BKR HOUSE VD YARD OR CARLTON AVE YARD - correct answer SOUTH OF FLATBUSH TERMINAL, DE...

View example

LIRR Verbatim Rules 2017 updated already passed

(0)
R177,26

LIRR Verbatim Rules 2017251 - correct answer On portions of the railroad and on tracks specified in the timetable, trains will run with reference to other trains in the same direction by block signals whose indications will supersede the superiority of trains 261 - correct answer On portions of t...

View example

LIRR Substations question n answers graded A+

(0)
R265,97

LIRR SubstationsA01 - correct answer Flatbush - 1/4 mile East of station - South side - * MG 480 volt 100 cycle A02 - correct answer Grand Avenue - 1018-20 Atlantic Avenue - South side A03 - correct answer Utica Avenue - 200ft West of Utica Avenue - South side A04 - correct answer East New ...

View example

LIRR Signals fully solved 2024

(0)
R319,20

LIRR SignalsNAME: Clear Block INDICATION: Proceed; Manual block clear - correct answer NAME: Clear Block INDICATION: Proceed; Manual block clear - correct answer NAME: Clear Block INDICATION: Proceed; Manual block clear - correct answer NAME: Clear INDICATION: Proceed - corre...

View example

LIRR Signals and Definitions questions with 100% correct answers 2024/2025

(0)
R203,87

LIRR Signals and DefinitionsClear-Block - correct answer Proceed; manual block clear. Stop-signal - correct answer Stop Clear - correct answer Proceed Absolute-Clear - correct answer Proceed; track clear to next interlocking signal. Approach next interlocking signal prepared to stop. App...

View example

LIRR signals 2018 updated already passed

(0)
R203,87

LIRR signals 2018Clear Block - correct answer Proceed; manual block clear Clear - correct answer Proceed Absolute-Clear - correct answer Proceed; track clear to next interlocking signal. Approach next interlocking signal prepared to stop. Approach limited* - correct answer Proceed approachi...

View example

LIRR Signalman Rules with 100% correct answers rated A+

(0)
R177,26

LIRR Signalman RulesWhat is the Ground Rule? - correct answer Each circuit, the functioning of which affects safety of train operation, shall be kept free of any grounds or combination of grounds which will permit in excess of 75% of the release value of any relay or other electromagnetic device in ...

View example

LIRR Signalman Nomenclature questions and answers rated A+

(0)
R177,26

LIRR Signalman Nomenclature 21NWC - correct answer 21 Switch Normal Correspondence. 100POB - correct answer 100~ Power Off Buss HENK - correct answer Hunt Entry Normal Indication 113MPFNWP2 - correct answer 113 Movable Point Frog Normal Switch Repeater Two 2EAS - correct answer 2 East A...

View example

LIRR signal and definition questions & answers rated A+

(0)
R265,97

LIRR signal and definitionDistant Signal - correct answer A fixed signal used to govern the approach to a home signal. Cab signal indicator - correct answer A signal indicator located in the engine control compartment displaying the maximum speed for the movement of the train. It will be used in ...

View example

LIRR Rules Test questions with 100% correct solutions

(0)
R354,69

LIRR Rules TestBefore taking any medication prescribed by a doctor, an employee must do what before reporting to work? - correct answer Contact the LIRR Physician-In-Charge SI 100-R What are the rest requirements for a type 1 vs a type 2 employee? - correct answer Type 1: 2 days off in a 14 day ...

View example

LIRR Rule 14 Engine Whistle or Horn Signals correctly answered rated A+

(0)
R177,26

LIRR Rule 14 Engine Whistle or Horn SignalsA. OO 2 Short sounds - correct answer to any signal not provided for. B. OOO 3 short sounds - correct answer 1. When standing: back. Answer to 12d and 16c. 2. When running: answer to 16c. C. OOOO 4 shorts sounds - correct answer Call for signal...

View example

LIRR Phase 1 Rules with complete solutions!

(0)
R319,20

LIRR Phase 1 RulesRule 87 - correct answer On single track where Rule 251 is in effect inferior trains must clear the time and block of opposing regular trains by no less than five minutes unless provided by Form L. When an inferior train is unable to clear the main track a crewmember must protect t...

View example

LIRR OPERATING RULES questions & answers

(0)
R319,20

LIRR OPERATING RULESWhat is the first importance in the discharge of duty? - correct answer Safety What must be done when in doubt or uncertainty? - correct answer In case of doubt or uncertainty a SAFE course must be taken What is essential to safety? - correct answer Obedience is essential t...

View example

lirr entrance exam study questions with verified solutions latest update 2024/2025

(0)
R203,87

lirr entrance exam studyA block signal system wherein the use of each block is governed by block signals controlled manually, by block-limit signals or both, upon information received by telephone, radio or other means of communication. - correct answer Manual Block Signal System A train given pr...

View example

LIRR Engineer(questions and answers)graded A+ passed

(0)
R265,97

LIRR EngineerBlock - correct answer A length of track defined limits, the use of which is govern by block signals, block limit signals, automatic speed control any combination thereof. Absolute Block - correct answer A block established between block stations, block limit stations, interlockings ...

View example

LIRR Definitions questions & answers graded A+ 2024/2025

(0)
R265,97

LIRR DefinitionsWORKING LIMITS - correct answer A segment of track with definite boundaries upon which trains may move only as authorized by the roadway worker in charge of that segment of track. AUTOMATIC SPEED CONTROL SYSTEM - correct answer A system so arranged that its operation will automati...

View example

LIRR Definitions fully solved rated A+ 2024/2025

(0)
R265,97

LIRR DefinitionsBLOCK - correct answer A length of track of defined limits, the use of which is governed by block signals, block-limit signals, automatic speed control or any combination thereof. ABSOLUTE BLOCK - correct answer A block established between block stations, block limit stations, in...

View example

LIRR DEFINITIONS 1 - 75 correctly answered rated A+ 2024/2025

(0)
R265,97

LIRR DEFINITIONS 1 - 75Block - correct answer A length of track of defined limits, the use of which is governed by block signals, block-limit signals, automatic speed control or any combination thereof. Absolute Block - correct answer A block established between block stations, block-limit statio...

View example

LIRR DEFINITIONS 1 - 64 with 100% correct answers rated A+

(0)
R230,48

LIRR DEFINITIONS 1 - 64Block - correct answer A length of track of defined limits, the use of which is governed by block signals, block-limit signals, automatic speed control or any combination thereof. Absolute Block - correct answer A block established between block stations, block-limit statio...

View example

LIRR BOOK OF RULES: Rules 201-238 Quiz (Form L / SRF / TSRB) correctly answered graded A+

(0)
R319,20

LIRR BOOK OF RULES: Rules 201-238 Quiz (Form L / SRF / TSRB)Form L's are in effect for how long? Form D? - correct answer Until Fulfilled, Superseded, Canceled or become Void. (Rule 204) Form D (NYT 2006)- until Fulfilled or Cancelled Any part of a Form L specifying a particular movement may ...

View example

LIRR Book of Rules Practice Exam fully solved

(0)
R407,92

LIRR Book of Rules Practice Exam __________ is of the first importance in the discharge of duty. - correct answer Safety (1) __________ to the rules is __________ to safety. - correct answer Obedience / essential (1) The company requires the _______, _________ and _________ discharge of duty ...

View example

LIRR Book of Rules Practice Exam 2016-17 updated already passed

(0)
R354,69

LIRR Book of Rules Practice Exam 2016-17__________ is of the first importance in the discharge of duty. - correct answer Safety (1) __________ to the rules is __________ to safety. - correct answer Obedience / essential (1) The company requires the _______, _________ and _________ discharge of...

View example

LIRR BOOK OF RULES: Clearance Cards Quiz (Phase I) correctly answered

(0)
R177,26

LIRR BOOK OF RULES: Clearance Cards Quiz (Phase I)List the colors of the following clearance cards: a. A b. K - correct answer A white K green What is the primary use of a K card? - correct answer Proceed at one or more block limit stations as though clear block signal were displayed List...

View example

LIRR BLOCK OPERATOR fully solved rated A+

(0)
R177,26

LIRR BLOCK OPERATORBlock - correct answer A length of track of defined limits, the use of which is governed by block signal, block limit signal, automatic speed control , or any combination thereof. Absolute Block - correct answer A block established between block stations, block limit stations, ...

View example

LIRR Authorities with verified solutions

(0)
R301,46

LIRR Authorities(Signals) To Pass a fixed signal indicating stop Zone C - Rule 241, Form L Zone A - Verbal permission from the Console Operator PSCC Rule 28A (pg. 31) & Special Instruction 2010-A (pg. I-96) (Track Cars) Track car to enter a block at a block station in Manual Block Signal S...

View example

LIRR Assistant Conductor well answered graded A+

(0)
R177,26

LIRR Assistant Conductorooooo Horn - correct answer 14F Call Inspector --o- 1A Horn - correct answer 14L When approaching a public highway grade crossing, a train or locomotive operating greater than 60MPH must sound the engine whistle at the whistle post. --o- 1B Horn - correct answer 14L If ...

View example

LIRR Assistant Conductor DEFINITIONS correctly answered

(0)
R239,36

LIRR Assistant Conductor DEFINITIONSBlock - correct answer Block- A length of track of defined limits, the use of which is governed by block signals, block-limit signals, automatic speed control or any combination thereof. Absolute Block - correct answer Absolute Block- A block established ...

View example

LIRR Airbrakes questions well answered 2024

(0)
R319,20

LIRR Airbrakes 1) Name the locomotive units operated on the LIRR. - correct answer E-10 Road Numbers: 100-107 E-15 Road Numbers: 150-172 DE 30 Road Numbers:400-423 DM 30 Road Numbers: 500-522 (ex 507) 2) Name the air pressure that is "train lined" on all trains operated on the LIRR. -...

View example

LIRR Air Brakes fully solved graded A+

(0)
R230,48

LIRR Air BrakesBrake Pipe Pressures: - correct answer Freight - 90 PSI. Diesel passenger 110 PSI. M3 Train 130 to 150 PSI. M7 Train 120 to 150 PSI. Main Reservoir 125 to 140 PSI (When applicable). Brake Cylinder Pressure - correct answer Approximately 45 to 60 PSI 30 PSI on cab car 70 PSI ...

View example

LIRR Air Brakes Review condr verified already passed 2024/2025

(0)
R319,20

1x sold

LIRR Air Brakes Review Colors for: -Brake pipe needle -Brake cylinder needle - correct answer Brake pipe = White Brake cylinder = Red Fully charged train, the brake pipe pressures for a diesel train and freight train (also M3 and M7) - correct answer Diesel = 110psi Freight = 90psi M3 = 13...

View example

LIRR Air Brake Questions well answered graded A+

(0)
R265,97

LIRR Air Brake Questions 2. Name the air pressure that is "train lined" on all trains operated on the Long Island Rail Road - correct answer Brake pipe pressure 3. Instructions for assisting disabled trains may be found in which LIRR publication? - correct answer THEM Manual - Train Handling E...

View example
Show all
avatar-seller

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BravelRadon. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R922,47. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling
R9.051,54 R922,47
  • (0)
  Buy now