[Show more]What is the safest type of glazing to use in a sidelight adjacent to a door? 
 
a. ceramic 
b. float 
c. wire 
d. tempered - d. tempered 
 
Which of the following agricultural product is NOT used in the production of panel products? 
 
a. Rice Straw 
b. Bagasse 
c. Wheat straw 
d. Poplar - d. poplar...
Preview 3 out of 29 pages
Add to cartWhat is the safest type of glazing to use in a sidelight adjacent to a door? 
 
a. ceramic 
b. float 
c. wire 
d. tempered - d. tempered 
 
Which of the following agricultural product is NOT used in the production of panel products? 
 
a. Rice Straw 
b. Bagasse 
c. Wheat straw 
d. Poplar - d. poplar...
To determine the necessary floor area for a project, the interior designer must know all the following EXPECT the 
A. Net assignable area 
B. Efficiency Factor 
C. Rentable-useable ratio 
D. Number of employees 
D. Number of employees 
The initial determination of the area required for a client's...
Preview 3 out of 29 pages
Add to cartTo determine the necessary floor area for a project, the interior designer must know all the following EXPECT the 
A. Net assignable area 
B. Efficiency Factor 
C. Rentable-useable ratio 
D. Number of employees 
D. Number of employees 
The initial determination of the area required for a client's...
Why does the HVAC system need to be balanced at the end of a commercial project? 
 
 A. To verify that air quality levels are within the design specifications 
 B. To detect significant air leaks in the ductwork. 
 C. To adjust airflow at each device location to meet the criteria in the engineer...
Preview 3 out of 17 pages
Add to cartWhy does the HVAC system need to be balanced at the end of a commercial project? 
 
 A. To verify that air quality levels are within the design specifications 
 B. To detect significant air leaks in the ductwork. 
 C. To adjust airflow at each device location to meet the criteria in the engineer...
In regard to interior design, what is a guard, and what dimension must it have in commercial construction? -Correct Answer This is a building component installed to prevent falls from an elevated area. Its required minimum heights 42" AFF 
 
What is fire resistance-rated glazing? -Correct Answer ...
Preview 3 out of 19 pages
Add to cartIn regard to interior design, what is a guard, and what dimension must it have in commercial construction? -Correct Answer This is a building component installed to prevent falls from an elevated area. Its required minimum heights 42" AFF 
 
What is fire resistance-rated glazing? -Correct Answer ...
The minimum number of toilet fixtures for an interior design is determined by occupant load and? -Correct Answer Occupancy group 
 
Where are flame spread ratings in a building the MOST restrictive -Correct Answer Exit enclosures 
 
Exit access corridors in non-sprinklered buildings must have a rati...
Preview 2 out of 6 pages
Add to cartThe minimum number of toilet fixtures for an interior design is determined by occupant load and? -Correct Answer Occupancy group 
 
Where are flame spread ratings in a building the MOST restrictive -Correct Answer Exit enclosures 
 
Exit access corridors in non-sprinklered buildings must have a rati...
Required fire rating of demising partition between tenant spaces -Answer- 1-hour 
 
Required fire rating of partitions along a public corridor -Answer- 1-hour 
 
Thresholds, if provided at doorways, shall be ___inch high maximum. -Answer- 1/2 inch maximum 
 
Doors opening from occupied spaces into t...
Preview 2 out of 11 pages
Add to cartRequired fire rating of demising partition between tenant spaces -Answer- 1-hour 
 
Required fire rating of partitions along a public corridor -Answer- 1-hour 
 
Thresholds, if provided at doorways, shall be ___inch high maximum. -Answer- 1/2 inch maximum 
 
Doors opening from occupied spaces into t...
In wet areas, what are the requirements for wall finishes? -Correct Answer - walls within 2' or service sinks, toilets, or urinals are required to be constructed of moisture resistant material (cement board, X) and are required to have tile (or similar) finish up to minimum 4' AFF. Wallcoverin...
Preview 2 out of 10 pages
Add to cartIn wet areas, what are the requirements for wall finishes? -Correct Answer - walls within 2' or service sinks, toilets, or urinals are required to be constructed of moisture resistant material (cement board, X) and are required to have tile (or similar) finish up to minimum 4' AFF. Wallcoverin...
Where would it be best to call out the frame material on an entry door? 
A. door schedule 
B. finish schedule 
C. hardware schedule 
D. finish plan 
A: Door Schedule 
When would be most appropriate for an interior designer to use the prefix letter ‘I’ when numbering a set of construction drawing...
Preview 4 out of 199 pages
Add to cartWhere would it be best to call out the frame material on an entry door? 
A. door schedule 
B. finish schedule 
C. hardware schedule 
D. finish plan 
A: Door Schedule 
When would be most appropriate for an interior designer to use the prefix letter ‘I’ when numbering a set of construction drawing...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller PossibleA. Stuvia facilitates payment to the seller.
No, you only buy this summary for R839,55. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
85443 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy summaries for 14 years now