on an impressed current cathodic protection system
all are examples of acceptable release detection f
when a steel tank is installed with a galvanic cp
Written for
UST Inspector Eam
UST Inspector Eam
1
review
By: warrenbrannoch • 3 weeks ago
By: phyliswambui996 • 3 weeks ago
I wish you all the best in your studies and in need of any study material ask and i will gladly help....thanks for the review, I really appreciate your feedback. Welcome again to my page!!
Seller
Follow
phyliswambui996
Reviews received
Content preview
U3 ICC Tank Tightness Testing
On an impressed current cathodic protection system, the negative wire of the rectifier is
connected to the:
a. Anode
b. Cathode
c. Drop tube
d. Dielectric union
b. Cathode
Brainpower
Read More
Previous
Play
Next
Rewind 10 seconds
Move forward 10 seconds
Unmute
0:00
/
0:00
Full screen
All are examples of acceptable release detection for tanks, except:
a. Impressed current cathodic protection
b. Automatic tank gauging
c. Statistical inventory reconciliation
d. Soil-vapor monitoring
a. Impressed current cathodic protection
When a tank is temporarily closed, the cathodic protection system:
a. Must be turned off
b. Must remain in operation
c. Should be removed
d. Operator can have it on or off.
b. Must remain in operation
, When a steel tank is installed with a galvanic CP system attached, the tank gauges are usually
connected through a riser with a dielectric bushing. What is the purpose of that?
a. To prevent static discharge
b. To minimize effects of noise
c. To electrically isolate the tank from the tank gauge
d. To prevent water intrusion in the tank
c. To electrically isolate the tank from the tank gauge
Factory-installed diectric coatings may include all of the following except:
a . Asphalt
b. epoxies
c. Enamels
d. fiberglass-reinforced plastic
a . Asphalt
According to the EPA, Tank tightness test data must be maintained for:
a. 18 months
b. 3 years
c. 5 years
d. Until the next test is performed
d. Until the next test is performed
How long must records of UST system repairs be available on site?
a. 60 days
b. 1 year
c. 5 years
d. for the remaining lifetime of the UST system
d. for the remaining lifetime of the UST system
In the event of a release, what is the reporting requirement?
a. ICC licensed supervisor must report the leak within 24 hours
b. Owner/Operator must report the leak within 24 hours
c. Owner/Operator must report the leak within 18 hours
d. ICC licensed supervisor must report the leak within 18 hours
b. Owner/Operator must report the leak within 24 hours
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying this summary from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller phyliswambui996. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy this summary for R204,95. You're not tied to anything after your purchase.