100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NICET Fire Alarm Level 1 exam 2024 with 100% correct answers R306,68   Add to cart

Exam (elaborations)

NICET Fire Alarm Level 1 exam 2024 with 100% correct answers

1 review
 23 views  0 purchase
  • Course
  • NICET
  • Institution
  • NICET

When a device is inaccessible due to excessive height, such as an atrium, what it the maximum interval for testing? Answer - 18 months When installing a wall-mounted fire telephone appliance to the public, what is the acceptable maximum mounting height from the floor? Answer - 66 inches Eleva...

[Show more]

Preview 2 out of 10  pages

  • February 7, 2024
  • 10
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • NICET
  • NICET

1  review

review-writer-avatar

By: aaroncook • 1 month ago

reply-writer-avatar

By: YANCHY • 1 month ago

"Thank you so much for the three-star review! I’m thrilled to hear that you had a positive experience with the exam. Your feedback means a lot and motivates me to keep delivering quality content. Best of luck with your studies, and I’m here if you need any further assistance!"

avatar-seller
NICET Fire Alarm Level 1 exam 2024 with
100% correct answers

When a device is inaccessible due to excessive height, such as an atrium, what it the maximum interval
for testing? Answer✔✔ - 18 months



When installing a wall-mounted fire telephone appliance to the public, what is the acceptable maximum
mounting height from the floor? Answer✔✔ - 66 inches



Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-
line of the door? Answer✔✔ - 21 feet



At minimum, when working near power lines with voltage of 600 volts and lower, an aerial lift operator
shall maintain which distance from the lines? Answer✔✔ - 10 feet



The use of unprotected EMT shall be permitted under which conditions? Answer✔✔ - when in direct
contact with the earth



According to NFPA 70, what is the maximum unsupported length of 1/2-inch flexible metallic conduit
where flexibility is required after installation? Answer✔✔ - 4 1/2 feet



What is the maximum bend (in degrees) permitted in a conduit run between outlet boxes? Answer✔✔ -
360 Degrees



If the primary power is disconnected and the fire alarm system goes into an alarm condition, what is the
minimum acceptable time for secondary power to operate the voice evacuation systems? Answer✔✔ -
15 minutes



A riser room temperature switch should activate when the temperature falls below which level?
Answer✔✔ - 40 degrees F

, According to NFPA 72, what is the maximum sound pressure level permitted in a space with notification
appliances? Answer✔✔ - 110 dBA



What is the minimum interval for testing a single-station smoke detector in multifamily units?
Answer✔✔ - Annually



Where should a technician install a detector in relation to beam that is less than 12 inches deep and less
that 8 feet in center? Answer✔✔ - At the bottom of the beam



An existing fire alarm cable in a drop ceiling will be spliced. which one of the following splice locations
will comply with NFPA 70? Answer✔✔ - secured inside a listed box or enclosure



Which function shall be tested for each newly installed smoke detector? Answer✔✔ - smoke entry?



An 180 foot long corridor is 10 feet wide, with a smooth 10 foot ceiling, interrupted by 4-inch beams
spaced every 10 feet. How many heat detectors with a listed 30 foot spacing are required? Answer✔✔ -
6 heat detectors



At which height must cables be physically protected when being installed within an exposed ceiling?
Answer✔✔ - 7 feet



When shall smoke detectors be installed during the construction process? Answer✔✔ - After the final
cleanup of all trades



Where structural members are provided, intermediate metal conduit shall be secured within which
maximum distance from an outlet box" Answer✔✔ - 3 feet



The requirement forbidding fire alarm circuits from being T-tapped, unless indicated by the
manufacturer's instructions, is intended to prevent which type of improper malfunction? Answer✔✔ -
monitoring integrity of installation conductors?



What is the maximum operating temperature of TW insulation? Answer✔✔ - 140 Degrees F, Table
310.15 (B)(16)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller YANCHY. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R306,68. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

66579 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling

Recently viewed by you


R306,68
  • (1)
  Buy now