MNO3701
ASSIGNMENT- 1(100%)
ASSIGNMENT- 2 (100%)
SEMESTER 1 -2024
2024
MNO3701
ASSIGNMENT-1 (100%)
ASSIGNMENT-2 (100%)
SEMESTER 1 -2024
This document contains
answers for both
assignments
,2/27/24, 1:46 PM Assessment 1: Attempt review
UNISA 2024 MNO3701-24-S1 Assessment 1
QUIZ
Started on Tuesday, 27 February 2024, 1:09 PM
State Finished
Completed on Tuesday, 27 February 2024, 1:44 PM
Time taken 34 mins 47 secs
Marks 20.00/20.00
Grade 100.00 out of 100.00
Question 1
Correct
Mark 1.00 out of 1.00
Which option can be classified as a transformed resource?
1. Information
2. Operations managers
3. Facilities
4. Staff
5. Globalisation
Your answer is correct.
The correct answer is:
Information
https://mymodules.dtls.unisa.ac.za/mod/quiz/review.php?attempt=14993144&cmid=889945 1/17
, 2/27/24, 1:46 PM Assessment 1: Attempt review
Question 2
Correct
Mark 1.00 out of 1.00
Identify the correct statement(s).
a. Within the production and operations management process, mapping is needed
to expose the reality of process behaviour.
b. Throughput time in production and operations management is calculated by
multiplying cycle time and work-in-progress.
c. Design within production and operations management should always be judged
on its quality, speed, dependability, flexibility and cost.
d. Within production and operations management, continuous processes refer to
low volume and high variety.
e. The project process within production and operations management refers to high
volume and low variety.
1. a
2. a, b
3. a,b, c
4. a, b, c, d
5. a, b, c, d, e
Your answer is correct.
The correct answer is:
a,b, c
https://mymodules.dtls.unisa.ac.za/mod/quiz/review.php?attempt=14993144&cmid=889945 2/17