ABSA 4th Part B Chapter 1 |Complete Questions with 100% Correct Answers
4 views 0 purchase
Course
AC-HPAT
Institution
AC-HPAT
ABSA 4th Part B
Chapter 1 Introduction to Power Engineering
In the early days, owners of power plants hired _____ workers, who
started out doing manual labour and through acquired experience
they were promoted to jobs with gradually increasing levels of skill.
a. Qualified
b. Highly educa...
absa 4th part b chapter 1 introduction to power en
Written for
AC-HPAT
All documents for this subject (384)
Seller
Follow
ACADEMICAIDSTORE
Reviews received
Content preview
ABSA 4th Part B
Chapter 1 Introduction to Power Engineering
In the early days, owners of power plants hired _____ workers, who
started out doing manual labour and through acquired experience
they were promoted to jobs with gradually increasing levels of skill.
a. Qualified
b. Highly educated
c. Trained
d. Unskilled
e. College trained.
d
Early government involvement in certification of power engineers
became more important for the following reasons except:
a. Efficiency
b. Labour mobility
c. Safety
d. Pollution
e. Technological advancements.
d
Which of the following is not a definition of a power plant?
a. Any one or more boilers in which steam or other vapour is
generated at more than 103 kPa.
b. Any one or more boilers containing liquid and having a
working pressure exceeding 1100 kPa.
c. Any one or more boilers containing liquid and having a
working temperature exceeding 121°C.
d. Any one or more boilers in which steam or other vapour is
generated at less than 57 kPa.
e. Any engine run from one or more boilers containing liquid and
having a working pressure exceeding 1100 kPa.
d
Committees that establish standards are composed primarily of
which of the following elements?
a. Only experts from the industry and government
b. One government appointed standards board
c. Experts from the industry, professional and insurance groups
and all levels of government
d. Only multi-National power corporations
e. One independent safety and standardisation board.
c
A Fourth Class Power Engineer's certificate of competency qualifies
the holder to take charge of the general care and operation of a
power plant consisting of one or more coil type drumless boilers
having an aggregate capacity of not more than _____ kW, when
used for the sole purpose of underground thermal flooding in oil
fields, as chief steam engineer.
,a. 1,000
b. 2,000
c. 3,000
d. 4,000
e. 5,000.
e
"Power plant" means any one or more boilers:
a. In which steam or other vapour is generated at more than 103
kPa.
b. In which steam or other liquid is generated at more than 103
kPa.
c. Containing liquid and having a working pressure exceeding
1,200 kPa (160 psi), and temperature exceeding 121°C.
d. Containing liquid and having a working pressure exceeding
1,200 kPa (160 psi), and a temperature not exceeding 121°C.
e. Containing liquid and having a working pressure not exceeding
121°C.
a
In order to produce greater efficiency, higher boiler pressures were
used and this led to _____ due to employing of unqualified
operators in a power plant.
a. Economic gains
b. Serious accidents
c. Higher efficiency
d. Safer working conditions
e. Less labour disputes.
b
A Fourth Class Power Engineer's certificate of competency qualifies
the holder to take charge of a shift in a power plant consisting of
one or more coil type drumless boilers having an aggregate capacity
of not more than _____ kW, when used for the sole purpose of
underground thermal flooding in oil fields, as shift engineer.
a. 10,000
b. 20,000
c. 30,000
d. 40,000
e. 50,000.
a
Which of the following is not a common work schedule for power
engineers?
a. Year round employment
b. Seasonal lay-offs
c. Eight hour days
d. Twelve hour days
e. Rotating day and night shifts.
b
Which of the following duties is a holder of a Fourth Class Engineer's
,Certificate of Competency not qualified to perform?
a. Take charge of a shift in a power plant having a capacity of
more than 10,000 kW, as shift engineer.
b. Take charge of the general care and operation of a power
plant consisting of one or more coil type drumless boilers
having an aggregate capacity not over 5,000 kW, when only in
use for the purpose of subterranean thermal flooding in oil
fields, as chief engineer
c. Take charge of the general care and operation of a power
plant having a capacity of not more than 1, 000 kW as chief
steam engineer, and to supervise the engineers in that plant.
d. Take charge of a shift in a power plant consisting of one or
more coil type drumless boilers having an aggregate capacity
of not more than 10,000 kW, when used only for underground
thermal flooding in oil fields, as shift engineer
a
Which of the following certificates of competency qualifies the holder
to take charge of the general care and operation of any power plant
as chief steam engineer, and to supervise the engineers in that plant
and take charge of a shift in any power plant as shift engineer?
a. Third Class Engineer's Certificate of Competency
b. Building Operator's Certificate of Competency
c. Pressure Welder's Certificate of Competency
d. First Class Engineer's Certificate of Competency
e. Fireman's Certificate of Competency.
d
When oil mixes with water in the boiler the resultant effect is:
a. Serious foaming
b. Accumulation of very hard scale resulting in tube burnout
c. Accumulation of soot
d. Decrease in water level
e. Shifting and loosening of baffles.
a
The holder of a Certificate of Competency, the classification of which
authorises him or her to act as a engineer, may sketch, construct,
install, operate, repair, and give advice on all things pertaining to
any _____ in which that person is employed.
a. Welding shop
b. Automotive shop
c. Power plant
d. Fish plant
e. Hydro plant.
c
In a power plant, the power engineer may function as a supervisor
who directs others in the _____ operation on a shift.
a. Simple an economical
b. Welding and electrical
c. Administrative and co-operative
d. Production and receiving
, e. Safe and efficient.
e
Which of the following is required in order to progress to a higher
certificate?
a. Experience only
b. Education, experience, and the next lower level certificate
c. Hold the next lower level certificate only
d. Both education and the next lower level certificate
e. Education only.
b
In Alberta, the Safety Codes Act established the following classes of
Power Engineer's certificates (other provinces and territories have
also established the same structure for these certifications.)
a. A, B, C, and D
b. 1, 2, 3, and 4
c. First, Second, Third and Fourth
d. Operators A, B, C and D
e. Boiler maker first, second, third and fourth.
c
A Fourth Class Power Engineer's certificate of competency qualifies
the holder to take charge of a shift in a power plant having a
capacity of not more than _____ kW, as a shift engineer.
a. 8,000
b. 9,000
c. 7,000
d. 6,000
e. 5,000.
e
Unqualified individuals operating a power plant or pressure plant risk
the _____ of the plant and the general public.
a. Health
b. Comfort
c. Resources
d. Safety
e. Economy.
d
The IAO is an organisation whose primary concern is:
a. Lowering of maintenance costs through standardisation
b. Lowering of production costs through increased automation
c. Increase in equipment quality through tougher government
regulation
d. Lowering of insurance costs through standardisation
e. Increase in safety awareness through public education.
d
A Fourth Class Power Engineer's certificate of competency qualifies
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying this summary from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICAIDSTORE. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy this summary for R341,48. You're not tied to anything after your purchase.