The International Residential Code is applicable to townhouses a maximum of______________ above grade plane in height and provided with separate means of egress. correct answers three stories If there is a conflict in the code between a general requirement and a specific requirement, the _______...

[Show more]

Preview 2 out of 14  pages

  • August 4, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CNST 130
  • CNST 130
avatar-seller
CNST 130 - CODE EXAM || with A+ Guaranteed Solutions.
The International Residential Code is applicable to townhouses a maximum of______________
above grade plane in height and provided with separate means of egress. correct answers three
stories

If there is a conflict in the code between a general requirement and a specific requirement, the
______________ requirement shall apply. correct answers specific

The building official has the authority to grant modifications to the code ______________ .
correct answers for individual cases where the strict letter of the code is impractical

A permit is not required for the construction of a one-story detached accessory structure when it
has a maximum floor area of ______________ square feet. correct answers 120

Unless otherwise mandated by state or local laws, the approved construction documents shall be
retained by the building official for a minimum of ______________ from the date of completion
of the permitted work. correct answers 180 days

A temporary certificate of occupancy is valid for what maximum period of time? correct answers
a period set by the building official

ASTM C1280 is a referenced standard addressing ______________ . correct answers exterior
gypsum sheathing installation

A permit may be suspended or revoked for all of the following reasons, except
______________ . correct answers where other permits by the contractor have been voided

The means of egress layout required as a part of the construction documents for which of the
following occupancies must include the number of occupants to be accommodated? correct
answers F-1

A stop work order shall be in writing and given to any of the following individuals except the
__________. correct answers permit holder

An institutional occupancy is typically considered Group ______________ . correct answers I

Accessory religious educational rooms need not be considered separate occupancies where the
occupant load is less than ______________ occupants. correct answers 100

The gaming floor of a casino shall be classified as a Group ______________ occupancy. correct
answers A-2

A facility used for supervised custodial care and housing more than 16 persons in a supervised
environment is classified as a Group ______________ occupancy. correct answers I-1

, A manufacturing facility utilizing highly toxic materials exceeding the maximum allowable
quantities set forth in Table 307.1(2) is considered a ______________ occupancy. correct
answers Group H-4

Owner-occupied lodging houses are permitted to be constructed in accordance with the
International Residential Code where there are a maximum of __________ guest rooms and
_____________ occupants. correct answers 5, 10

Unless protected by an automatic sprinkler system, what is the minimum required fire separation
between a 350-square-foot laundry room and the manufacturing building it is incidental to?
correct answers 1-hour fire barrier and/or horizontal assembly

Where an automatic sprinkler system without a fire barrier is utilized for the protection of
incidental use areas, what minimum level of separation is required? correct answers construction
capable of resisting the passage of smoke

Where the provisions for nonseparated occupancies are used for a mixed-occupancy building, the
most restrictive ______________ requirements shall apply to the nonseparated uses. correct
answers Chapter 9 (fire protection)

Where the provisions for separated occupancies are utilized for a fully sprinklered building
housing both a Group A-2 occupancy and a Group R-1 occupancy, the minimum required
separation between the two occupancies shall be a ______________ . correct answers 1-hour fire
barrier/horizontal assembly

What types of construction are considered "noncombustible"? correct answers I, II

Where used in floor framing, solid sawn wood beams of Type IV construction shall be of what
minimum nominal size? correct answers 6 inches by 10 inches

Based on Chapter 2, which one of the following members is not considered to be a part of the
primary structural frame? correct answers floor joists

In a building of Type VA construction, which of the following building elements does not
require a minimum 1-hour fire-resistance rating? correct answers interior nonbearing wall

In a one-story Type IA building, what is the minimum required fire-resistance rating for the
interior bearing walls supporting the roof only? correct answers 2 hours

Considering all occupancies and construction types, for which minimum fire separation distance
is no fire rating required for a nonbearing exterior wall? correct answers 30 feet

Show windows may be of combustible construction in Type I and II construction where located a
maximum of ______________ above grade. correct answers 15 feet

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller FullyFocus. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R217,43. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling
R217,43
  • (0)
  Buy now