Erosion and Sediment Control exam questions with 100- correct answers

Preview 4 out of 38  pages

  • August 25, 2024
  • 38
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Erosion and Sediment Control
  • Erosion and Sediment Control
avatar-seller
Erosion and Sediment
Control exam questions with
100% correct answers

Minimum Standard 1 - answer Stabilization


permanent or temporary soil stabilization shall be
applied to denuded areas within seven days after
final grade is reached on any portion of the site;
temporary soil stabilization shall be applied within
seven days to denuded areas that may not be at
final grade but will remain dormant for longer than
14 days; permanent stabilization shall be applied
to areas that are to be left dormant for more than
one year


Site NOT at Final Grade - answer - stabilize in 14
days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - answer - stabilize in 7 days
(recommended immediately)
- permanently or temporarily seed and mulch

,- mulch/matting/straw


Minimum Standard 2 - answer Stock Piles, Waste
and Borrow Areas


during construction, soil stock piles and borrow
areas shall be stabilized or protected with
sediment trapping measures


mulch prevents erosion by protecting the surface
from raindrop impact and silt fence intercepts and
detains from disturbed areas


Minimum Standard 3 - answer Permanent
Vegetation


permanent vegetation cover shall be established
on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be
considered established until a ground cover is
achieved that is uniform, mature enough to
survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from
disturbed area

,this is the standard used to verify that a site is
ready for release of bonds or surety


Minimum Standard 4 - answer First-Step Measures


Sediment basins and traps, perimeter dikes,
sediment barriers and other measures intended to
trap sediment shall be constructed as a first step
in any land-disturbing activity and shall be made
functional before upslope land disturbance takes
place


a certain amount of initial land disturbance may be
required to provide access for equipment to install
the perimeter controls, but site clearing and
grading should be kept to a minimum until the
perimeter controls are in place


intercepts and detains small amounts of sediment
from disturbed areas during construction operation
to prevent sediment from leaving the site and
decrease velocity of sheet flows and low-to-
moderate level channel flow


Perimeter Controls - answer assures that sediment
does not leave the perimeter of the land-disturbing
area once site clearing, grading, and construction
commences

, Examples: silt fences, sediment traps, sediment
basins, construction entrance, temporary
diversions, diversions


Minimum Standard 5 - answer Earthen Structure
Stabilization


stabilization measures shall be applied to earthen
structures such as dams, dikes, and diversions
immediately after installation


reduce erosion and sedimentation and reduce
damage from sediment and runoff to downstream
or off-site areas


Minimum Standard 6 - answer Traps and Basins


sediment traps and basins shall be designed and
constructed based upon the total drainage area
(not just disturbed area) to be served by the trap
or basin


Sediment Traps - answer minimum storage
capacity shall be 134 cubic yards per acre of
drainage area and shall only control drainage areas
less than 3 acres

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GUARANTEEDSUCCESS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R289,22. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82265 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling
R289,22
  • (0)
  Buy now