BSCI 4610 Test 1 Question and answers 100% correct 2024 BSCI 4610 Test 1 - Holley Hoisting and access are considered top considerations in site utilities. - correct answer T Sites with sand while easy to move, pose security issues - correct answer T Temp. underpinning insulations are ...

[Show more]

Preview 2 out of 5  pages

  • September 4, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • BCIS 4610
  • BCIS 4610
avatar-seller
BSCI 4610 Test 1 - Holley
Hoisting and access are considered top considerations in site utilities. -
correct answer ✔T


Sites with sand while easy to move, pose security issues - correct answer
✔T


Temp. underpinning insulations are considered real schedules activities with
real potential to impact the schedule. - correct answer ✔T


A dewatering systems with multiple pvc pipes are installed in a sleeve around
a project perimeter os called - correct answer ✔well point


In a vertical build proj. which componet is the ultimate goal to release the next
set of activities - correct answer ✔building pad


Ultilty trenching can impact surroudning activities - correct answer ✔T


Wether or not shallow foundations can be formed is primarily dependent on
soil type - correct answer ✔T


Since sewerlines under a footprint are gravitiy driven they would typically be
installed before foundations - correct answer ✔FALSE / sewer lines have
leniance


dispacement cast piles - correct answer ✔many in number, small in diameter

, Post. tension would require less steel tonnage but the PM would need to think
about time allowed to cure so tendons may be stressed. - correct answer ✔T


In most multi story CIP frames, the SOG would be placed after the foudations
but before the first set of verticals - correct answer ✔F


permanent power availability can have a significant impact on a previous
schedule based on being able to drive equipment motors at design speed,
and also to provide actual permanant lighting quailty for finishies installation. -
correct answer ✔T


power circuit homeruns are time consuimg as they are always required to be
run overhead - correct answer ✔False


all of the following are electrical distrubution componets that require rough in
activites, except:
- MC cable,
-EMT,
-Rigid conduit,
- bus duc - correct answer ✔ALL


2 MEP trades left up to the contractor to design and coordinate - correct
answer ✔electrical and fire protection


MEP trades would have very few activities in finishes - correct answer ✔F


In a typical vertical building project. most mep systems rough-in is overhead -
correct answer ✔T

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Academia199. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R243,64. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73243 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling
R243,64
  • (0)
  Buy now