Journeyman lineman TEST Latest Update Actual Exam with Questions and 100% Verified Correct Answers Guaranteed A+ Approved by the Professor R371,97   Add to cart

Exam (elaborations)

Journeyman lineman TEST Latest Update Actual Exam with Questions and 100% Verified Correct Answers Guaranteed A+ Approved by the Professor

 6 views  0 purchase
  • Course
  • Journeyman lineman
  • Institution
  • Journeyman Lineman

Journeyman lineman TEST Latest Update Actual Exam with Questions and 100% Verified Correct Answers Guaranteed A+ Approved by the Professor

Preview 2 out of 10  pages

  • September 11, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Journeyman lineman
  • Journeyman lineman
avatar-seller
Journeyman lineman TEST Latest Update 2024-
2025 Actual Exam with Questions and 100%
Verified Correct Answers Guaranteed A+
Approved by the Professor

A 10 KVA transformer is rated 7200 volts primary and 120 volts secondary. What is full
load current? - CORRECT ANSWER: 10,000/120=83.3 primary
7200/120= 6
60 to 1 ratio
83.3/60= 1.38 secondary


A conductor is pulled to what tension? - CORRECT ANSWER: 50%


A three phase transformer voltage is 66000/12470Y. Full load on high side is 13.1 amps.


What are the amps on secondary?


What is the KVA capacity? - CORRECT ANSWER: 66000/12470=5.29
5.29x13.1=69.29 or


69.3amps secondary


12470x69.3x1.732
-------------------
1000
=14.967
Or 15KVA capacity

, A. Define load factor.


B. Define KVA


C. Define KW - CORRECT ANSWER: A. Ratio of average load to peak load
B. Apparant power
Amps x volts/1000
C. True power
Amps x volts xPF/1000


At what angle does a lifting sling have the same weight stress as the load being lifted? -
CORRECT ANSWER: 30*


At what angle is the weight stress reduced approximately 1/2 of the load being lifted? -
CORRECT ANSWER: 60*


Can transformers of different polarity be parallel?
How do you test polarity? - CORRECT ANSWER: Yes
H1. H2
/
VM
\
X1. X2


High side fuses are ordinarily from 200 to 300% of full load current of transformers, if
short circuit capacity will permit. What size fuse will be needed for a 66 KV, 1500KVA at
300% - CORRECT ANSWER: 66000/1.732=38106
1500/3=500 KVA. or
500,000 KV

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R371,97. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling
R371,97
  • (0)
  Buy now