3rd Class Stationary Steam Engineer License Prep 2024/2025 Latest Questions And Answers
530 views 1 purchase
Course
3rd Class Stationary Steam Engineer License
Institution
3rd Class Stationary Steam Engineer License
_________ are necessary for complete combustion - Correct Answer-time, temperature, mixture, and atomization
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - Correct Answer-214.7
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes...
3rd Class Stationary
Steam Engineer
License Prep
2024/2025
Latest Questions And
Answers
pg. 1 professoraxe l
,_________ are necessary for complete combustion - Correct
Answer-time, temperature, mixture, and atomization
if the steam pressure gauge indicates 200 PSIG, the absolute
pressure is______ - Correct Answer-214.7
a boiler is operating at 400 PSI, and the safety valve opens at
410 PSI and closes at 398 PSI. The blowdown is______psi -
Correct Answer-12
an oil cooler is commonly used with a(n) ________ when
operating in conjunction with a turbo-generator - Correct
Answer-steam turbine
a boiler is producing 40,000lb of steam/hr at a pressure of 100
PSI and a steam temperature of 500 degrees Fahrenheit. The
steam produced is _______ steam - Correct Answer-
superheated
pg. 2 professoraxe l
,the economizer on a boiler is used to _______ - Correct
Answer-add heat to the feed water
blowers are normally used with________ boilers - Correct
Answer-water tube
overheating of tubes on a boiler can be caused by________ -
Correct Answer-scale on tubes
carbon dioxide in a condensate return system
causes_________ - Correct Answer-channeling
a ________ pump is a positive displacement pump - Correct
Answer-reciprocating
a boiler generating 6000 lb of steam/hr produces
_______btu/hr - Correct Answer-6,000,000
a bottom blowdown is performed on a boiler to _____ -
Correct Answer-discharge sludge and sediment
pg. 3 professoraxe l
, water columns are connected to the boiler with a minimum of
_______" pipe - Correct Answer-1
the minimum size of a water column blowdown valve
is_______". - Correct Answer-3/4
the maximum size bottom blowdown valve on a boiler
is_________". - Correct Answer-2 1/2
a ________ allows condensate to pass through, but stops
Steam. - Correct Answer-a steam trap
when taking over a shift, the first thing to do is check
the________ - Correct Answer-water level in each boiler
according to the asme code, a high-pressure boiler having
more than 500 square feet of heating surface shall
have________ - Correct Answer-two or more safety valves
the probable cause of an increase in temperature of gases of
combustion at the boiler Outlet is____ - Correct Answer-dirty
heating services
pg. 4 professoraxe l
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying this summary from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller PatrickHaller. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy this summary for R252,27. You're not tied to anything after your purchase.