100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IDPX - PRACTICE EXAM QUESTIONS AND ANSWERS R233,07   Add to cart

Exam (elaborations)

IDPX - PRACTICE EXAM QUESTIONS AND ANSWERS

 4 views  0 purchase
  • Course
  • IDPX
  • Institution
  • IDPX

IDPX - PRACTICE EXAM QUESTIONS AND ANSWERS

Preview 2 out of 12  pages

  • October 28, 2024
  • 12
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • IDPX
  • IDPX
avatar-seller
IDPX - PRACTICE EXAM QUESTIONS AND ANSWERS
With whom should the interior designer consult to determine where to locate the
standing stacks in a library?
A. mech engineer
B. library planner
C. structural engineer
D. fire protection designer - Answers- C. The structural engineer

In specifying new window coverings and tracks to replace building standard window
coverings, what coordination is MOST important for the ID to undertake? (choose 4 that
apply)

A. Verify the building owner approves of the change in the building's exterior
appearance
B. Asking the electrical engineer if the new light reflectance is detrimental
C. Determine if the mech. engineer objects to the replacement plans
D. getting approval from the client concerning the color of the coverings
E. verifying with the manuf. that flammability does not pose a problem
F. checking with the architect that the new coverings do not adversely effect the heating
of the glass - Answers- A. Verify the building owner approves of the change in the
building's exterior appearance

C. Determine if the mech. engineer objects to the replacement plans

E. Verifying with the manuf. that flammability does not pose a problem

F. checking with the architect that the new coverings do not adversely effect the heating
of the glass

In designing a new space, the ID can influence life safety MOST by coordinating with
the consultant concerning what? - Answers- Sprinklers

Who is responsible for showing the telephone and data conduit runs on the drawings for
a commercial design project? - Answers- Electrical Engineer

Who would be responsible for ordering and placing a stone top of a custom built
reception desk that includes woodwork, stone, metal and a light fixture? - Answers-
Woodwork fabricator

Who is responsible for verifying that a recessed downlight does not interfere with the
ductwork shown on the mechanical plans? - Answers- The interior designer

The final responsibility of awarding a contract rests with the.. - Answers- owner

, An interior designer has written furniture specs for a project and has put the job out for
bid to several dealerships. In this situation, purchase orders are MOST likely to be
written by the... - Answers- Dealership.

Who is responsible for determining the location and general conditions of existing light
fixtures as part of a due diligence investigation? - Answers- The Interior Designer.

Which type of chart is MOST often used with complex projects to show critical tasks and
their associated times? - Answers- CPM chart

One of the primary advantages of a full wall schedule is that it.. - Answers- involves the
ENTIRE PROJECT TEAM in the scheduling!

The interior designer is responsible for which of the following aspects of consultant
coordination ? - Answers- A. Giving the electrical engineer information about the client's
equipment

B. Providing the mechanical engineer with the occupant load for each space

D. Making sure the final drawings and specifications are coordinated

F. Giving the elec. engineer the designers preferred choices for luminaires

When coordinating with a security consultant, the ID's drawing should show - Answers-
The positioning of the required lighting.

Thermostat locations are determined by the ... - Answers- The mechanical engineer.

In which of the following building types are fire-resistive construction requirements likely
to be greatest? - Answers- Type 1,
Type II-A,
Type II-B

Furniture budgets can be accurately estimated by the.. (which 2 parties?) - Answers-
The interior designer and the furniture dealer.

Which of the following pairs of building code requirements is MOST critical for the ID to
know before starting the preliminary space planning? - Answers- The Number of exits &
the Maximum distance to exits

In addition to meeting the requirements of the ADA, what other accessibility
requirements should the ID be most concerned with when doing design development for
a commercial project? - Answers- B. Scoping provisions of the local building code

Most building codes in the U.S. are established by .. - Answers- LOCAL governments!

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GEEKA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R233,07. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

60904 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling
R233,07
  • (0)
  Buy now