BMZ ACADEMY
BMZ ACADEMY
@061 262 1185/068 053 8213
BMZ ACADEMY 061 262 1185/068 053 8213
,8/25/24, 9:14 PM Assessment 3: Attempt review
MNO2601-24-S2 Welcome Message Assessment 3
QUIZ
Started on Friday, 16 August
2024, 10:06 PM
State Finished
Completed on Saturday, 17 August
2024, 4:16 AM
Time taken 6 hours 9 mins
Marks 20/22
Grade 91 out of 100
Question 1
Correct
Mark 1 out of 1
Configuring a supply network means
determining its overall pattern. State if
the following option is true or false.
Disintermediation is a strategy that is
linked to supply network configuration.
True
False
The correct answer is 'True'.
https://mymodules.dtls.unisa.ac.za/mod/quiz/review.php?attempt=21031441&cmid=994205#question-21262876-6 1/9
,8/25/24, 9:14 PM Assessment 3: Attempt review
Question 2
Correct
Mark 5 out of 5
Design processes involve several
processes. Organise the stages of design
in sequential order: 1
Concept generation ,2
Concept screening ,3
Preliminary design ,4
Evaluation and improvement , 5
Prototyping and final design .
Your answer is correct.
The correct answer is:
Design processes involve several
processes. Organise the stages of design
in sequential order: 1 [Concept
generation], 2 [Concept screening], 3
[Preliminary design], 4 [Evaluation and
improvement], 5 [Prototyping and final
design].
https://mymodules.dtls.unisa.ac.za/mod/quiz/review.php?attempt=21031441&cmid=994205#question-21262876-6 2/9
, 8/25/24, 9:14 PM Assessment 3: Attempt review
Question 3
Correct
Mark 5 out of 5
Concerning process design, match
column A to column B.
Less disruption, confusion,
Quality and rescheduling within
the process
Low cost/fast volume and
Speed
timing changes
Less wasted effort within
Dependability
the process
Flexibility Low processing costs
Short customer waiting
Cost
time
Less wasted effort within the process
Quality
Less disruption, confusion, and rescheduling within the proces
Dependability
Short customer waiting time
Speed
Low cost/fast volume and timing changes
Flexibility
Low processing costs
Cost
Your answer is correct.
The correct answer is:
Quality → Less wasted effort within the
process,
Dependability → Less disruption,
confusion, and rescheduling within the
proces,
Speed → Short customer waiting time,
Flexibility → Low cost/fast volume and
timing changes,
Cost → Low processing costs
https://mymodules.dtls.unisa.ac.za/mod/quiz/review.php?attempt=21031441&cmid=994205#question-21262876-6 3/9