Turbine - Study guides, Study notes & Summaries
Looking for the best study guides, study notes and summaries about Turbine? On this page you'll find 1700 study documents about Turbine.
Popular textbooks 'Turbine' · Show all (5) Hide
All 1.700 results
Sort by
-
ICC California UST Inspector Exam Questions and Answers 100% Correct 202425 Version.
- Exam (elaborations) • 84 pages • 2024
- Available in package deal
-
- R289,80
- 3x sold
- + learn more
ICC California UST Inspector Exam Questions and Answers 100% Correct 202425 Version. 
 
 
 
 
 
 
 
Which agency approves a site-specific variance which allows for an alternative method of construction or monitoring: 
a.) The Regional Water Quality Board 
b.) The State Water Resources Control Board 
c.) The Department of Toxic Substance Control 
d.) The local agency	a.) The Regional Water Quality Board 
CCR Title 23, Sec 2681(a) 
The regulations to enforce compliance of underground storage tank...
-
GSA school Mod 2 review exam questions & answers 2023/2024
- Exam (elaborations) • 9 pages • 2023 Popular
- Available in package deal
-
- R158,33
- 2x sold
- + learn more
GSA school Mod 2 review exam questions & answers 2023/2024 
 
 
What is used to provide electrical power and a ship's main propulsion system? - ANSWER-Marine gas turbines 
 
What must be modified by the addition of a power turbine and reduction gear for propulsion? - ANSWER-Marine gas turbines 
 
What are the elements required for proper operation of the gas turbine engine? - ANSWER-Newton's third law and Bernoulli's principle 
 
What is newtons third law? - ANSWER-For every action there is an e...
-
3B2 - Ultimate ABSA Study Guide C1-15 Study Guide Questions with Complete Solutions 100% Verified Correct Answers Latest Updated 2024/2025
- Exam (elaborations) • 296 pages • 2024
- Available in package deal
-
- R270,22
- 2x sold
- + learn more
3B2 - Ultimate ABSA Study Guide C1-15 Study Guide Questions with Complete Solutions 100% Verified Correct Answers Latest Updated 2024/2025 
Turbine nozzles convert heat energy into: 
a. Potential energy. 
b. Enthalpy. 
c. Eddy-currents. 
d. Kinetic energy. 
e. Pressure. - Correct Answer D 
 
Labyrinth seals are: 
1. Made of cast iron. 
2. A positive leak-proof seal arrangement. 
3. Design to have large clearances between the shaft and casing. 
4. Made of brass or stainless steel. 
5. Used on lar...
-
FAC1602 ASSESSMENT 4 UNISA SEMESTER 2 2024 Qumbu Energy Ltd installs wind power turbines for renewable energy projects in OR Tambo District Municipality in the Eastern Cape. The company services government contracts and private energy rms, operating from
- Exam (elaborations) • 511 pages • 2024
-
- R50,00
- 1x sold
- + learn more
FAC1602 ASSESSMENT 4 UNISA SEMESTER 2 2024 
 
Qumbu Energy Ltd installs wind power turbines for renewable energy projects in OR Tambo District Municipality in the Eastern Cape. The company services government contracts and private energy rms, operating from Qumbu with projects mainly along the municipality. In 2023, Qumbu Energy completed three major installations, growing rapidly as renewable energy demand rises. 
 The following nancial information is presented to you to assist in the analysis...
-
Solutions for Wind Energy Design, 1st Edition Corke (All Chapters included)
- Exam (elaborations) • 81 pages • 2024
-
- R549,95
- 1x sold
- + learn more
Complete Solutions Manual for Wind Energy Design, 1st Edition by Thomas Corke, Robert Nelson ; ISBN13: 9781138096028. (Full Chapters included Chapter 1 to 12).... Ch.1 solutions not available..... 
1. Introduction 
2. Wind Regimes 
3. Introduction to Aerodynamics 
4. Aerodynamic Performance 
5. Horizontal Wind Turbine Rotor Design 
6. Wind Turbine Control 
7. Structural Design 
8. Wind Farms 
9. Wind Turbine Acoustics 
10. Wind Energy Storage 
11. Economics 
12. Design Summary and Trade Study
As you read this, a fellow student has made another R85
-
3rd Class Stationary Steam Engineer License Prep 2024/2025 Latest Questions And Answers
- Exam (elaborations) • 39 pages • 2024
-
- R251,57
- 1x sold
- + learn more
_________ are necessary for complete combustion - Correct Answer-time, temperature, mixture, and atomization 
 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - Correct Answer-214.7 
 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi - Correct Answer-12 
 
an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-generator - Correct Answer-steam turbine 
 
a b...
-
BDOC NSS LATEST QUESTIONS WITH COMPLETED ANSWERS, GRADED A+
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- R156,46
- 1x sold
- + learn more
DDG 1/3 Bell - 0-7 knots 
DDG 2/3 Bell - 8-12 knots 
DDG Standard Bell - 13-19 knots 
DDG Full Bell - 20-27 knots 
DDG Flank Bell - 28+ knots 
DDG Max Bell - 30+ knots 
DDG Displacement - 9200 tons 
DDG Beam - Hull: 66 ft 
(SLQ-32 decks overhang 4 feet on each side) 
DDG Shadow Distance - 160 ft 
DDG Propulsion Plant - 4 Gas Turbine Engines 
100,000 total shaft HP 
DDG Electrical Plant - 3 Gas Turbine Engines 
DDG Height of Eye - 56 ft 
DDG Air Draft - 122 ftDDG Draft - 32.5 ft 
DDG Length - 509...
-
Z-51 Written Test Questions And Answers
- Exam (elaborations) • 29 pages • 2024
- Available in package deal
-
- R279,54
- 1x sold
- + learn more
Z-51 Written Test Questions And Answers 
 
In a steam turbine, what is the function of a Kingsbury thrust bearing? 
 
A) Maintain first stage steam pressure. 
B) Compensate for coupling misalignment. 
C) Adjust shaft torque at start up. 
D) Maintain axial positioning of the rotor shaft. - ANS D) Maintain axial positioning of the rotor shaft. 
 
The ratio of actual pressure of water pressure in the atmosphere to the saturated pressure of given temperature is 
 
A) partial pressure. 
B) relativ...
-
3rd class stationary steam engineer license prep questions with complete solutions
- Exam (elaborations) • 33 pages • 2024
-
- R158,33
- 1x sold
- + learn more
_________ are necessary for complete combustion correct answer: time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ correct answer: 214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi correct answer: 12 an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-generator correct answer: steam turbine a boiler is produci...
-
Tech 3 - Wind Turbine Technician Questions with complete solutions
- Exam (elaborations) • 90 pages • 2024
-
- R288,87
- + learn more
Tech 3 - Wind Turbine Technician Questions with complete solutions
-
Wind Turbine Technician Questions with Complete solutions
- Exam (elaborations) • 21 pages • 2024
-
- R298,19
- + learn more
Wind Turbine Technician Questions with Complete solutions
How did he do that? By selling his study notes on Stuvia. Try it yourself! Discover all about earning on Stuvia